iblync · Cloud migration

Cloud database migration in Saudi Arabia, with production still running

A cloud database migration moves a production database from your own servers, or from another cloud, into a managed or self-run database in a cloud region, without losing data and without taking the business offline for days. For Saudi organisations two questions come first: which region the data may land in, and whether the cloud provider's own migration service is enough. iblync, Interkey's own migration and replication platform, is for the moves where it is not.

In short, for executives

  • The decision that comes first: where the data may live. Some data classes may sit abroad, some need an in-Kingdom region, some stay on your own systems.
  • Regions in the Kingdom: Google Cloud runs a region in Dammam. AWS has announced a Saudi Region; plan around what is live on the day you buy.
  • The tool: when source and target are the same engine, the cloud provider's own migration service is often the simplest path. When engines differ or both systems must stay live and in step, iblync is built for that.
  • The risk: rarely the copy. It is the cutover, an unrehearsed rollback, and data passing through somewhere nobody approved.
  • What Interkey does: assessment, the migration with iblync, cutover, and support from Riyadh afterwards. Priced by quotation.

At a glance

Cloud database migration with iblync at a glance
QuestionAnswer
What movesRelational and NoSQL databases, from your data centre or another cloud, into a cloud region
Target cloudsAWS, Microsoft Azure and Google Cloud, managed database services or databases you run on cloud servers
In-Kingdom regionsGoogle Cloud Dammam (me-central2) is live; the AWS Saudi Region is announced; check each provider's list when you buy
PatternThrottled initial load, continuous replication, parallel running, then a planned cutover with rollback
Where iblync runsConfirmed per engagement, with whether any data leaves your environment
Commercial modelBy quotation: source systems, target systems and data volume

What a cloud database migration has to cover

Copying tables into a cloud database is the easy part. A cloud database migration that holds up in production settles five things before the first byte moves:

  • The target region, chosen from the data's classification, not from a price list.
  • The target service, a managed database or the same engine on cloud servers.
  • The data model, because a move to a different engine means transformation, and that is real work.
  • The downtime the business will grant, usually a few hours at a weekend, not the days a bulk export wants.
  • The proof: counts, checksums and application checks that show the move is complete.
Read more

Typical starting points are a data-centre exit with a fixed date, a move from a region abroad into the Kingdom, a change of engine during the move, or a cloud reporting copy that must stay in step with an on-premise system. Our cloud migration practice decides which applications should move at all; this page covers the databases underneath them.

Moving databases into cloud regions in the Kingdom

The region map is changing, so read this as dated. Google Cloud runs a region in Dammam (me-central2); our Google Cloud in Saudi Arabia page explains access. AWS has announced a Saudi Region and says it is on track to launch in December 2026; it was not in AWS's Region list on 2 November 2026 (see AWS in Saudi Arabia). For Azure, check Microsoft's region list when you buy.

Read more

A live region does not mean every service is live in it, so check that the managed database and version you need are offered there. And a plan that depends on a region opening on schedule carries a risk it does not control: classify the data now and keep the source in service until the region is ready. Moving twice, first to a nearby region, is possible; write it into the plan.

The cloud provider's own service, or a vendor-neutral tool

AWS, Azure and Google Cloud each offer their own database migration service, and for many moves it is the right choice. Check these points first.

Choosing between a cloud provider's own migration service and a vendor-neutral tool such as iblync
Question to checkProvider's own service usually fits whenA vendor-neutral tool such as iblync fits when
Source and target enginesBoth are the same engine, or a pairing the provider documents and supportsThe engines differ, for example a relational source and a NoSQL target, and transformation is real work
Where the target livesThe target is that provider's managed databaseThe target is on another cloud, on your own servers, or in more than one place
After the moveThe source is switched off once the move is doneBoth systems stay live and in step for a long period, or in both directions
Effect on productionThe source can take the extra load of the copyThrottling and queueing are needed so the move does not compete with production
A second migrationThis is a one-offMore databases follow, and configured workflows make each one cheaper than the last

The rule on our iblync product page applies here: when a supported native path exists between the two systems, it is usually cheaper and better supported, and we will say so.

How iblync moves a database into the cloud

iblync follows the pattern Interkey uses when production must keep running:

  • Initial load. The bulk of the data is moved once, throttled so it does not compete with production.
  • Continuous replication. Later changes are applied to the cloud target continuously, and queue instead of failing if the target is unavailable.
  • Parallel running. Both databases stay live and in step for as long as validation requires. Reads can move first, service by service.
  • Cutover. In an agreed window the last changes drain, checks run, then reads and writes switch. The source stays until the numbers hold through a real peak.
Read more

iblync's own site states that an interrupted migration resumes where it stopped and that validation uses checksums and row counts. Listed sources include MySQL, PostgreSQL, SQL Server and IBM DB2. Our zero downtime migration page sets out what stays live in each phase.

Migrate a database to AWS, Azure or Google Cloud

The method stays the same; the details change. To migrate a database to AWS, ask which managed engine and version you need, whether your chosen region offers it, and how the network path from your data centre is set up. An Azure database migration raises the same questions against Microsoft's services and regions. A GCP database migration into Dammam adds one: confirming your account has access to the region.

A programme can use both tools: the provider's service for like-for-like moves, and iblync for moves between engines or systems that must stay in step.

Data residency during the migration, not only after it

Residency is usually discussed for the target. The move itself needs the same scrutiny: data passes through a replication engine, sometimes a staging area, and often logs and monitoring. Each has a location, and each should be approved as deliberately as the target region.

In Saudi Arabia the frameworks that shape the answer include the Personal Data Protection Law, overseen by the Saudi Data and AI Authority (SDAIA), and the cloud controls of the National Cybersecurity Authority (NCA), alongside any rules of your own sector regulator. We do not restate what they require; read the authorities' own texts with your compliance owner, because obligations depend on your sector and your data classes.

Read more

What we can do is keep the path inside the boundary you set. Where the replication engine runs, next to the source or in the target region, is confirmed per engagement before any data moves. Interkey works from Riyadh, with Arabic-speaking engineers from scoping to support. Our observability data residency guide applies the same reasoning to monitoring data.

What drives the cost and the timeline

iblync is priced by quotation, against the source systems, the target systems and the data volume. There is no published price list. The provider bills the target database separately.

The timeline depends on your estate more than on the tool: how far the data models differ, how many applications use the database, how much data changes during the move, the network path into the region, and how long you want parallel running. We give an estimated range after the assessment, with its reasons.

How Interkey runs a cloud database migration

  1. Assess.

    Databases, versions, volumes, change rates, data classes and the downtime window. The answer can be "do not move this one".

  2. Choose region and path.

    The target region and service per database, and for each one, the provider's own service or iblync.

  3. Design and prove the target.

    Schema, queries and indexes tested against production-shaped data in the cloud region.

  4. Load and replicate.

    Throttled initial load, then continuous replication with queueing, inside the agreed residency boundary.

  5. Run in parallel, then cut over.

    Reads first, then writes, behind pass conditions agreed in advance and a rehearsed rollback.

  6. Stabilise and support.

    Tuning under real load, then handover or support from Riyadh.

Questions buyers ask

Which cloud regions inside Saudi Arabia can we migrate a database into?

Google Cloud runs a region in Dammam. AWS has announced a Saudi Region, on track for December 2026 by AWS's account; it was not in its Region list on 2 November 2026. Check each list, and your database service, when you buy.

Should we use the cloud provider's migration service or iblync?

For a like-for-like move into that provider's managed database, its own service is often simpler. iblync fits when engines differ, when both systems must stay in step, or when the target is elsewhere.

Does our data leave the Kingdom while the database is being migrated?

Only if the plan routes it out. The replication engine, staging area and logs each have a location, agreed with your security team first. iblync can run inside the Kingdom.

How long does a cloud database migration take for a Saudi organisation?

It depends on how far the data models differ, how many applications use the database, how much data changes during the move and how long you want parallel running. We give an estimated range after the assessment, with the reasons behind it.

How is a cloud database migration with iblync priced?

By quotation, against the source systems, target systems and data volume in scope. The cloud provider bills the target database separately. There is no published price list.

Can the on-premise database keep running after we move to the cloud?

Yes. Replication keeps both in step for as long as you need, and the source stays after cutover until the numbers hold through a real peak, so switching back stays possible.

Next step

Scope a cloud database migration

Tell us the source databases and versions, the cloud and region you are considering, a rough data volume, and the downtime window the business will grant. The reply comes from the team that would run the migration.

Required field

By sending this form, you agree to our Privacy Notice.

Or directly

+966-11-2180999 [email protected]

Tawuniya Towers, North Tower, 7th Floor, King Fahad Highway, Olaya, P.O. Box 56835, Riyadh 11564, Saudi Arabia

or Provider service or vendor-neutral tool

Published by Interkey. Last updated . Interkey is registered in Riyadh, Saudi Arabia under commercial registration 1010156897.