Business continuity plan: impact analysis, ISO 22301 and the IT part, for Saudi organisations

A business continuity plan says how your organisation keeps its most important activities running, or brings them back, after a serious disruption: a lost building, a failed data centre, a cyberattack, a supplier that stops. It starts with a business impact analysis, sets a recovery target for each activity, then asks the technology to meet those targets. This guide covers how the plan is built, ISO 22301, what NCA ECC asks for in general terms, and where Interkey delivers the IT part in Saudi Arabia.

Orientation

At a glance

The guide in one table, for the reader with five minutes.

What it is
A documented way to keep critical activities running, or restore them, after a serious disruption
Where it starts
A business impact analysis: which activities matter, and how long each can stop
What it sets
A recovery time and a tolerable data loss for each activity, then for the systems behind it
Standard
ISO 22301, the international standard for business continuity management systems
In Saudi Arabia
NCA ECC includes a cybersecurity resilience domain; sector regulators and contracts can add more
What Interkey does
The IT part: backup, a recovery site, in-Kingdom failover and the tests, from Riyadh

In short, for executives

  • A business continuity plan belongs to the business, not to IT, with a named owner for each activity.
  • The impact analysis comes first. Without it, recovery budgets go to whichever system shouts loudest.
  • Technology answers to the targets. Backup, a recovery site and failover are chosen to meet the recovery times the business set.
  • A plan nobody has rehearsed is a draft. Exercises with written results make it one an assessor accepts.

What a business continuity plan covers, and what it leaves to others

A business continuity plan answers four questions for each critical activity: what must keep running, how soon it must be back, what it needs (people, premises, suppliers, systems, data), and who decides and acts when it stops. It also sets how the organisation communicates during a disruption.

It is broader than technology. A payroll run needs the HR system, but also the two people who approve it and a place they can work from. A plan that lists only servers misses most of what stops an organisation.

How each system is technically recovered belongs to the IT recovery plan, covered on our disaster recovery page. The business continuity plan sets the targets; the disaster recovery design meets them.

BCP vs DRP: how the two plans divide the work

The two are often confused because they share vocabulary. This is how they divide the work in most organisations.

Business continuity plan and disaster recovery plan compared by scope, owner, starting point, content and proof
Business continuity plan (BCP)Disaster recovery plan (DRP)
ScopeCritical activities: people, premises, suppliers, systems, communicationIT systems and the data they hold
OwnerA senior business manager, with an owner per activityIT, against the targets the business set
Starts fromThe business impact analysisThe recovery targets that come out of it
ContainsPriorities, workarounds, roles, who declares a disruption, communicationRecovery site, backups, replication, runbooks, failover steps
ProofExercises with the people who would act, and a written resultRestore and failover tests, timed against the targets

Business impact analysis: where the plan starts, and what to record

A business impact analysis (BIA) asks each part of the organisation what it does, what would happen if it stopped, and how long it could stop before the harm became unacceptable. Record one row per critical activity; IT fills in the systems row.

Fields of a business impact analysis record, what each means, and who usually supplies it
FieldWhat it meansUsually supplied by
Activity and ownerWhat the activity is, and the person accountable for itDepartment head
Impact over timeWhat happens after an hour, a day, a week without itActivity owner, finance, compliance
Maximum tolerable downtimeThe point at which the harm is no longer acceptableActivity owner, approved by management
Recovery targetHow soon the activity must be back, at a minimum levelActivity owner
Systems and dataThe applications behind the activity, with RTO and RPO for eachIT, with the activity owner
People, premises, suppliersKey staff and their deputies, workplaces, third parties the activity depends onActivity owner, procurement
WorkaroundHow the activity can continue, at reduced level, while systems are downActivity owner

Harm is more than money: penalties, regulatory exposure, safety and the trust of customers and government clients. The analysis produces a ranked list of activities, each with a maximum tolerable downtime and a recovery target. For the systems behind each activity these become a recovery time objective and a recovery point objective; our glossary entry on RTO and RPO explains both. A risk assessment runs alongside it, and the two together decide where continuity money is spent.

ISO 22301 and business continuity management, topic by topic

ISO 22301 is the international standard for business continuity management systems, built on the structure ISO's management system standards share. Topics in plain words; read the clauses in the current edition.

The subjects ISO 22301 covers for a business continuity management system, and the evidence each usually produces
TopicWhat it asks the organisation to haveEvidence it usually produces
ContextAn understanding of the organisation, interested parties, legal and regulatory requirements, and the scope of the systemA scope statement and a list of requirements
LeadershipCommitment from top management, a business continuity policy, defined rolesAn approved policy and named roles
PlanningActions on risks and opportunities, and business continuity objectivesObjectives with owners and dates
SupportResources, competence, awareness, communication and documented informationTraining records, a communication plan
OperationBusiness impact analysis and risk assessment, continuity strategies, plans and procedures, an exercise programmeThe BIA, the plans, exercise reports
Performance evaluationMonitoring and measurement, internal audit, management reviewAudit reports, review minutes
ImprovementHandling nonconformities and corrective action, continual improvementA corrective action log

The standard is published by ISO. Certificates are granted by certification bodies, not by whoever helped build the system, and many organisations use the standard as a structure without certifying.

NCA ECC business continuity: what it asks for, in general terms

The National Cybersecurity Authority (NCA) issues the Essential Cybersecurity Controls; the current edition on its site is ECC-2:2024. Among its main domains is cybersecurity resilience, which concerns keeping cybersecurity requirements inside the organisation's business continuity management: a continuity plan that also works when the disruption is a cyberattack, and recovery that does not reopen the door the attacker used. NCA's implementation guide names government organisations and their affiliated entities as its scope; other organisations should read the scope with their compliance owner.

Read more

We do not quote control numbers here. What an assessor usually asks to see is the chain: an approved plan, the impact analysis behind it, recovery targets, a design that meets them and the last exercise result. Our NCA ECC guide covers scope and evidence. A sector regulator or a government contract can add terms of its own.

The IT part of business continuity management: backup, recovery site and in-Kingdom failover

Once the targets exist, the technology has three jobs.

  • Copies that restore. Backups for every system in the plan, at least one copy that production credentials cannot change, restored on a schedule to prove it works. See cloud backup in Saudi Arabia.
  • A place to recover to. A second zone, an in-Kingdom cloud region, a local provider or a second site of your own, chosen by the recovery time each tier needs.
  • Failover that respects residency. A recovery copy is still your data, so it follows the same classification rules as production. Google Cloud runs a region in Dammam; AWS says its Saudi Region is on track for December 2026. Our guide to data residency in Saudi Arabia covers which data may live where.

Each tier in the impact analysis should map to one recovery pattern, written down where the business owner can read it.

What the plan document contains, and how to exercise it

Whatever template you use, check that the items opposite are in it and current. Then exercise it. Exercises range from a tabletop session, where the people who would act walk through a scenario, to a full rehearsal where an activity actually moves to its workaround or recovery site.

Start with tabletops: they are cheap and find the missing deputy, the phone list on the server that just failed, the supplier nobody called. Then add technical tests for the top tier. Each exercise ends with a dated result and an owner for each fix; repeat on your policy's schedule and after significant changes.

Where Interkey fits, and where it does not

Interkey delivers the IT side of business continuity. We help gather the systems data for the impact analysis, agree RTO and RPO with each business owner, design and build the backup and recovery environment on partner clouds or your own infrastructure, run the first tests and operate it afterwards under a written scope. Interkey is a partner of Google Cloud and of AWS.

Read more

We do not write your whole business continuity management system, set your risk appetite or certify you against ISO 22301; a full programme, premises and people included, belongs with your continuity or risk team, and we work alongside them on the technology. If your recovery is already tested against targets the business has signed, there is little for us to add.

Interkey has worked in Saudi enterprise IT since 1999. Our engineers work from Riyadh, write runbooks and test reports in Arabic and English, and join your exercises. Support after go-live comes from the same team.

What drives the cost and the timeline

There is no list price. The cost of the IT part follows the number of systems in the plan, how tight their targets are, the recovery pattern each tier needs, the data volume copied and kept, and how often recovery is tested. The timeline depends on the same things, and on whether an impact analysis already exists. We give both as an estimated range after a first review, with the reasons.

How the IT part of a continuity plan runs with Interkey

  1. Read the plan and the impact analysis.

    Or, where they do not exist yet, gather the systems behind each critical activity with its owner.

  2. Agree targets per tier.

    An RTO and RPO for each system, signed by its business owner.

  3. Check today against the targets.

    Current backups, their last restore, where copies live, and the gaps.

  4. Design and build.

    Backup, the recovery location your classification allows, and the pattern each tier needs.

  5. Test and operate.

    A first recovery test with a written result, then scheduled tests and reports.

Questions Saudi organisations ask about business continuity

What should a business continuity plan include for a company in Saudi Arabia?

Its scope and owner, the ranked activities from the impact analysis with recovery targets, who declares a disruption, roles and deputies, workarounds, the link to the IT recovery plan for each system, communication in Arabic and English, and an exercise schedule.

What is the difference between a BCP and a DRP?

The business continuity plan covers critical activities as a whole: people, premises, suppliers and systems. The disaster recovery plan covers the technical recovery of IT systems, against the targets the business continuity plan set.

Does our organisation need ISO 22301 certification?

Not in general. Many organisations use ISO 22301 as a structure without certifying. Whether you need the certificate depends on your contracts, your clients and your sector regulator. Certification is granted by certification bodies.

What does NCA ECC ask for on business continuity?

ECC-2:2024 includes a cybersecurity resilience domain, which concerns cybersecurity requirements within business continuity management. Read the current text with your compliance owner; an assessor usually asks for the plan, the targets, the design and the last test result.

How long does a business impact analysis take, and what drives its cost?

It depends on how many departments and systems are in scope and how available their owners are. We estimate the IT part after a first review, and quote it with any build or licences in one proposal.

Who in the organisation should own the business continuity plan?

A senior business manager, with an owner for each critical activity. IT owns the recovery of systems against the agreed targets, but not the plan itself.

Next step

Get a cloud plan for your workloads

Tell us which activities and systems your continuity plan covers, whether an impact analysis exists, and whether recovery has been tested. We will reply with the first step we would take on the IT part.

Required field

By sending this form, you agree to our Privacy Notice.

Or directly

+966-11-2180999 [email protected]

Tawuniya Towers, North Tower, 7th Floor, King Fahad Highway, Olaya, P.O. Box 56835, Riyadh 11564, Saudi Arabia

or What goes in an impact analysis

Published by Interkey. Last updated . Interkey is registered in Riyadh, Saudi Arabia under commercial registration 1010156897.