What is Lockout Tagout (LOTO)?

Lockout tagout is a procedure that ensures equipment cannot be started while someone is working on it. Every energy source feeding it is disconnected, a lock is fitted to the isolating device and a tag is attached carrying the name of whoever placed it and the date — and only that person removes their own lock. The governing rule: one lock per person, one key in their hand.

01Why it matters

Why it matters

The most dangerous moment in maintenance is not the work itself but unexpected start-up during it: someone else restoring power, a control system resuming automatically, or stored energy releasing suddenly. Lockout tagout exists to make that physically impossible rather than merely agreed verbally.

The energy most often forgotten is not electrical but residual: pressure trapped in a line, a suspended weight that can drop, a compressed spring, retained heat, or fluid that can flow in from another direction. This is why isolation does not end at opening a breaker — it ends at verifying that the energy is actually at zero.

02Examples

Examples of what gets isolated

  • Primary and secondary electrical supply to the equipment.
  • Compressed air or hydraulic lines feeding it.
  • Fluid or gas supply valves, secured in the closed position.
  • Moving parts that could travel under their own weight, mechanically supported.
  • Control systems that could restart automatically when power returns.

03The procedure

How it is applied — six steps

  1. Notify

    Inform everyone affected before the equipment is shut down.

  2. Shut down

    Stop the equipment through the correct operating sequence, not by abrupt cut-off.

  3. Isolate

    Disconnect every feeding energy source — electrical, pneumatic, hydraulic, fluid and gas.

  4. Lock and tag

    A lock on each isolating device, and a tag carrying the name and date. Every member of the crew applies their own lock.

  5. Release stored energy

    Bleed pressure, support suspended parts, release springs, allow heat to dissipate.

  6. Verify zero

    Attempt to start the equipment through the normal control to confirm it does not respond, then return the control to off.

That last step is the most frequently skipped and the most important. Verification is what turns isolation from an assumption into a proven fact.

04In a Saudi context

In a Saudi context

On sites where maintenance is carried out by contractor crews, a recurring challenge appears: overlapping lock ownership. Equipment is isolated by one crew and worked on by another in a later shift, leaving responsibility for lock removal unclear at handover. This is why a record of who applied each lock and when, together with documented shift handover, is part of the procedure rather than administrative overhead on top of it.

06The product connection

How this relates to SquintPRO

Isolated equipment remains an area nobody outside the authorised crew should approach for the full duration of the work. Defining the equipment perimeter as a zone during the maintenance window turns any unexpected entry into a case someone is alerted to at the time, and leaves a record of who entered and when. Read about the platform.

07FAQ

Questions people ask

Short answers to what people most often ask about this term.

What is lockout tagout (LOTO)?

Lockout tagout is a procedure that keeps machines and energy sources switched off and isolated while someone works on them. Each worker puts their own lock and tag on the isolation point, so the equipment cannot be started by anyone else.

Why is LOTO important?

Equipment that starts, moves or releases stored energy while people are working on it causes serious injuries. LOTO makes sure the energy is isolated, released and proven dead before the work begins.

What are the steps of lockout tagout?

Plan and notify, shut the equipment down, isolate every energy source, lock and tag each isolation point, release or block stored energy, and test that the equipment cannot start. The locks come off only in the reverse order, by the people who put them on.

Next step

Verifying isolation before the work starts

Tell us how your lockout-tagout procedure runs today, and we say which steps a camera can observe and which remain a matter of procedure.

Or directly

+966-11-2180999 [email protected]

Tawuniya Towers, North Tower, 7th Floor, King Fahad Highway, Olaya, P.O. Box 56835, Riyadh 11564, Saudi Arabia

Required field

The Riyadh team reviews your request and a specialist replies on Saudi working days, in Arabic or English. Your details are used only to reply to you. Privacy Notice

Published by Interkey. Last updated . Interkey is registered in Riyadh, Saudi Arabia under commercial registration 1010156897.